Original fittings
- Acid dissolves the original chrome layer on Bern Old Town fittings from the 1950s–70s.
- One application destroys what has survived 60+ years of daily use.
Bern has hardness grade 1–2 — one of the softest tap waters in Switzerland, from the Aare river. Limescale forms slowly. Yet Old Town sanitary installations with original chrome from the 1950s–70s still demand strictly material-neutral methods. Acid forbidden, substance preserved.
“No bot. No hold queue.”
Bern enjoys hardness grade 1–2 — among the softest in Switzerland, sourced from the Aare river and Wohlensee reservoir. Limescale deposits form very slowly. That sounds like a straightforward situation — and it is, with one significant "but" .
The "but" is UNESCO Old Town original substance . In Bern's medieval properties, sanitary installations survive with original chrome layers from the 1950s–70s, original silicone from the same era, sometimes authentic ceramics. Acid does not only dissolve the rare limescale here — it dissolves irreplaceable fabric that survived decades of use.
We calibrate on two levels: the water (grade 1–2, very soft) and the material (original substance vs. modern). Before the first deployment the material is identified, then the method is chosen — never the other way around.
“Soft water is a gift. Original chrome from 1965 is irreplaceable. We treat both accordingly.”— Muharem Berisha
Even in Bern's very soft water, the wrong cleaning agent causes irreversible damage to historic sanitary substance. Old Town bathrooms can lose in one treatment what survived half a century.
Four steps — from water verification to sealing. For Old Town original substance especially conservative; for modern installations in Bümpliz and Länggasse efficiently calibrated.
Mixer taps, tap systems, shower heads. Original chrome in Old Town strictly material-neutral — no acid contact. Modern fittings pH-calibrated. Moving parts cared for.
Real glass shower walls in modern flats, glass doors, mirrors. Mineral residue dissolved even from very soft Bern water, sealing preserved — resealed on request.
Uric scale bonds in the water rim, discolouration on the bowl, flush rim crust. Completely removed — including on historic installations with care for the ceramic surface.
Original silicone in Thun Old Town bathrooms is irreplaceable — cleaned acid-free only. Modern joints cleaned mineral-based, without wash-out or joint structure damage.
Bathroom mirrors, chrome-plated brackets, towel rails. Descaled, polished, protected. For original chrome from the 1950s–70s: fully acid-free, with restraint.
Before every treatment: material identified. Original chrome, real chrome, stainless steel, natural stone, 1960s ceramics — each gets its specific method. Documentation included.
Form, phone or WhatsApp. You tell us: flat type (Old Town vs. modern district), number of sanitary installations, approximate age of the fabric. Written quote within 4 hours.
Confirmation within 24 hours. Bern is on our regular ~50-min route via A1/A6 — appointments are plannable, including for the Spital Thun area and Old Town addresses.
Sanitary installations clear, fittings shining, joints without discolouration — original fabric intact. 0 acid damage, guaranteed. With sealing on request.
Contact us for a non-binding audit. Within 24 hours you receive a tailored analysis of your property.
“No bot. No hold queue.”